Filming on Location & Permits
Plan and Approve Your Filming Location
Successful location filming starts with permission, preparation, safety planning, and respect for the property and the people who use it.
Use this page to understand what you need before filming on DePaul property, on non-DePaul property, or in a public location that may require a permit.
Important: Locations that are not student-owned generally require an approved SCA Project Number through the Greenlighting process. All DePaul spaces must be officially reserved before filming.
A location reservation or owner's permission does not replace SCA project approval, permits, insurance, or safety requirements.
If you have not yet determined your approval path, begin with Start a Project.
Before You Choose a Location
☐ Confirm whether the location is DePaul property, student-owned property, non-DePaul private property, public property, a park, a forest preserve, or an independently managed location.
☐ Confirm whether your project requires Greenlighting.
☐ Obtain permission from the property owner, Space Manager, or permitting agency, as applicable.
☐ Identify filming dates, hours, crew size, equipment, vehicles, and activities.
☐ Determine whether permits, insurance, a COI, LOI, location agreement, or other documentation may be required.
☐ Include all known location information in your project submission.
Need Help?
If you are unsure whether your location requires a Project Number, permit, Space Manager approval, insurance, or additional safety planning, contact the SCA Production Office before proceeding.
SCA Production Office production@cdm.depaul.edu (312) 362-6862
Last updated